Selection and installation precautions of hydraulic double ferrule tube fitting
1. Selection points :
-Select appropriate materials and specifications based on work pressure and medium.
-Ensure that the fitting matches the size of the pipeline to avoid leakage or damage caused by size discrepancies.
-Consider environmental factors such as temperature, corrosiveness, etc., and choose joints that are corrosion-resistant or high-temperature resistant.
2. *Installation precautions :
-Before installation, check if the end face of the pipeline is flat to ensure that the ferrule can be evenly engaged.
-When tightening the nut, a torque wrench should be used to avoid deformation or damage to the ferrule due to excessive tightening.
-After installation, conduct a pressure test to ensure that the fittings are leak free.
The future development trend of hydraulic double ferrule tube fitting
1. Material Innovation : With the development of new material technology, higher strength and lighter materials such as titanium alloys and composite materials will be used for future double ferrule tube fittings.
2. Intelligent design : By integrating sensors and monitoring systems, real-time monitoring of the status of fittings can improve the safety and reliability of the system.
3. Environmental Protection and Energy Conservation: Develop more environmentally friendly manufacturing processes and materials to reduce environmental impact and improve the energy efficiency of fittings.